USA Transformers
Home/What we buy/Padmount Transformer
Oil-filled

Sell your surplus padmount transformers.

Highest volume category for us. Ground-level enclosure, dead-front, loop or radial feed.

Get an offer

What we pay for and why

Value on a padmount transformer comes down to kVA, primary voltage, winding metal, age, and whether it still tests. New surplus on the skid is worth the most. Failed units are worth their metal and oil.

Ratings we buy

Categoryoil filled
Phases1 and 3 phase
Voltage classmedium
1-phase kVA25, 50, 75, 100, 167
3-phase kVA45, 75, 112.5, 150, 225, 300, 500, 750, 1000, 1500, 2000, 2500, 3000, 3750, 5000
Photos we needNameplate, open cabinet, exterior
FreightIncluded in the offer

What drives the number on this unit

Common ratings move fastest

A 12470GrdY/7200 primary into 480Y/277 is the workhorse of American distribution. Units on common ratings resell quickly, and the offer shows it. Odd primaries still sell, just slower and lower.

Copper vs aluminum windings

The nameplate or a test tells us which. Copper-wound units carry more value intact and as scrap.

Dead-front condition

Bushings, elbows, and the cabinet interior drive the refurb math. A clean interior photo can move an offer up a tier.

Loop vs radial feed

Loop-feed units fit more resale applications. It is on the nameplate and in the cabinet; we will spot it in your photos.

Reading the nameplate

On a padmount the nameplate is inside the cabinet, usually riveted to the door or the dead-front panel. Open the hood, photograph the whole plate straight on, and get the kVA, primary, secondary, and impedance in frame. If the door is locked or rusted shut, shoot the exterior and tell us; we price it as unverified and adjust after inspection.

Freight and rigging

A 75 kVA single-phase unit runs roughly 800 to 1,200 pounds and rides a liftgate flatbed. A 500 kVA three-phase runs 3,500 to 5,000 pounds and wants a forklift or a truck-mounted crane. At 2500 kVA and up you are in the 12,000-pound class and we plan rigging. All of it is our cost and our schedule to solve; what we need from you is honest access notes.

Six-step sell process

  1. 01
    Send three photos and a ZIP code
  2. 02
    We read the nameplate and reply
  3. 03
    You get a written offer
  4. 04
    We schedule freight and rigging
  5. 05
    Pickup and paperwork
  6. 06
    You get paid within 3 business days of a passed test

PCB and oil note

Oil-filled units built before 1980 may contain PCBs. If your unit is that age and has not been sampled, we sample before an offer is final. We do not give disposal instructions on this site. Call us and a person will walk you through it.

FAQ

Yes. The core, windings, tank steel, and oil all carry value. Tell us the failure mode if you know it.

Have a unit you want gone? Send three photos and a ZIP code.